So when we started the "remodel project" .. it was back in September. We had a new front door installed and new french doors to replace the sliding doors to the back yard and patio. Then we had a new sink, mirror, tub/shower unit installed in the hallway bathroom. Then a shower stall in the master bathroom. As of today we now have a new cabinet and sink in the master bathroom.
We also got new lights in the hallway and entryway.
Then the kitchen was basically gutted, a door moved, cabinets removed and new ones installed with a new configuration. New counter tops, new dishwasher, new garbage disposal, and an over the stove microwave. As of today we now also have a new kitchen sink and running water.
We now have to wait until after the holidays to get our reverse osmosis system hooked back up. However, today was the major PLUMBING day.. with most everything water related getting done.
After weeks of not really being able to use the kitchen, I am not sure how to behave... but I'm sure I will figure it out.
There are still alot of projects that need done around the house...but this was the BIG one.
Painting everywhere, yardwork, some little odds and ends... it will all get done.
Time for some celebrations :)